Manta Barrier System Installation for Public Walkway in Lincoln

Project Overview:

SafeSite Facilities was engaged to install a secure barrier system to facilitate a safe public walkway while essential construction works were being carried out on the pedestrian footpath. Our client, a leading traffic management company, requested the works to be completed on a high-traffic route in Lincoln. Due to the volume of daily traffic, the installation had to be performed outside of peak hours, with stringent safety measures and tight timeframes for completion.

Client Requirements:

The primary objective was to ensure the safety of pedestrians while allowing construction works to take place without compromising public access. The client selected the Manta Steel Barrier 1.5m long in red and white for several reasons:

  • The alternating red/white colour scheme provided a clear and highly visible indication of the restricted area, contributing to enhanced public safety.
  • The speed and ease of installation of the Manta Steel Barrier ensured that the work could be completed within the narrow time window, a critical factor given the busy nature of the area.

manta barrier installation on road way

 

Challenges:

  • Time Constraints: The project needed to be completed quickly due to the limited window available for installation. The client’s schedule required us to work efficiently while maintaining safety standards.
  • Out-of-Hours Working: The works were carried out during off-peak hours to minimise disruption to public traffic and to ensure the safety of pedestrians. This required careful planning and coordination to guarantee that all work could be executed during the designated out-of-hours period.
  • Weather and Visibility: Weather conditions played a key role in ensuring that the installation was carried out safely. The team had to plan for visibility, especially since the installation was conducted after dark, and the potential for adverse weather such as rain or high winds was a consideration.
  • Team Safety: Safe working practices were essential, and with the team working during out-of-hours, extra measures were implemented to ensure both visibility and safety. Appropriate lighting and high-visibility gear were used, and the site was fully assessed for any hazards that could affect the team during the installation process.

 

Solution:

SafeSite Facilities was able to deliver the project within the required timeframe by adhering to the following steps:

  1. Efficient Planning and Coordination: Our team conducted a comprehensive site survey in advance to ensure that the installation would run smoothly. This included identifying potential risks and ensuring the required materials were on hand.
  2. Secure Barrier Installation: Using the Manta Steel Barriers, we efficiently created a secure and clearly marked public walkway, ensuring that pedestrians could safely navigate the area while construction works were carried out. The highly visible red/white barrier design ensured clear demarcation of the restricted area.
  3. Out-of-Hours Work Management: The installation was completed during the designated out-of-hours period, ensuring minimal disruption to local traffic and pedestrian flow. The team used temporary lighting and reflective vests to ensure safety throughout the process.
  4. Risk Mitigation: Despite the challenges posed by night-time working and unpredictable weather, our team was able to ensure the work was completed safely and efficiently. Adequate measures were taken to manage risks, including ensuring the barriers were securely installed to withstand any adverse weather conditions.

manta barrier installation on road way

Outcome:

The installation of the Manta Steel Barrier system was completed successfully within the required timeframe, and the public walkway remained secure throughout the construction period. By working closely with the client and adhering to strict safety protocols, SafeSite Facilities ensured minimal disruption to both pedestrians and traffic.

The project was carried out with a strong focus on safety, efficiency, and quality, leaving the client satisfied with the results and confident in the safety of the public walkway during the course of the essential construction works.

Client Feedback:

Our client expressed their satisfaction with SafeSite Facilities’ professionalism and ability to meet strict time constraints. The quick and efficient installation of the secure barrier system contributed to the smooth progress of the construction work and helped ensure public safety during a critical phase of the project.

Conclusion:

SafeSite Facilities demonstrated its ability to respond to tight deadlines and complex challenges while maintaining high standards of safety and quality. This project highlights our expertise in barrier installation and our commitment to providing safe solutions for both public and worker safety in high-traffic areas.